Six AI-powered tools for construction delay claims. Register events, issue notices, build formal claims, respond to rejections, analyse programmes, and assemble evidence — generating submission-ready documents in minutes.
The AI extracts delay-relevant clauses, notification periods, EOT provisions, and time bar deadlines.
Register events, set deadlines, issue notices before contractual periods lapse.
Walk through the 5-step wizard. The AI generates a 9-section narrative with programme and financial analysis.
Download as a formatted Word document. Review, supplement with project-specific evidence, and submit.
Contract-aware formal notices of delay with clause references and templated output.
Full 9-section EOT claim narratives — introduction through prolongation costs — guided by AI.
Structured responses targeting each ground of rejection with evidence citation.
Upload P6 .xer or .xlsx for critical path, float distribution, and Gantt chart.
Track every delay event from identification through resolution with deadline alerts.
Classify and compile evidence into claim-ready bundles with gap analysis.
Supports FIDIC 2017, NEC4, JCT, AS 4000, and bespoke contracts. The AI references your specific clauses.
Word export with cover page, headers, section numbering, and professional formatting.
Time Impact Analysis, Windows, As-Planned vs As-Built, Impacted As-Planned, Collapsed As-Built.
Upload project records and instantly see which of 14 evidence categories lack contemporaneous documents.
Never miss a contractual notice period. Deadline alerts flag events approaching notification deadlines.
Claim in AUD, AED, EUR, GBP, JPY, or USD with automatic formatting.
FIDIC, NEC4, JCT, AS 4000 clause awareness. Enterprise-grade security. All seven AI-powered modules included.
Need a team licence or annual plan? Email hello@delayclaimbuilder.com